European Space Operations Center, Darmstadt
Parent Institutions [?]
Child Institutions [?]
Affiliated Works
sorted by decreasing year, and then by display-name
- Large Scale GPS Processing at ESOC for LEO, GNSS and Real-Time Applications
- International GPS Service - 10 Years History, New Directions for GNSS and Space Geodesy
- Global Navigation Satellite Systems: A Perspective on Reference Frame Evolution Over the Next Decade With GPS, GLONASS and Galileo
- The Venus Express Mission
- Calibration of the Large Area Mass Analyzer (LAMA) instrument for the detection of cosmic dust
- First Attempts At Using COSMIC Data For GPS Orbit Determination
- Combined processing of observations from different Global Navigation Satellite Systems
- Preparing for Galileo - New Results from Anechoic Chamber Absolute Antenna Calibrations
- Geometrical Method for the Calculation of Spherical Harmonics up to an Arbitrary Degree and Order
- IDS contribution to ITRF2008
- Interactions of the IGS reprocessing and the IGS antenna phase center model (Invited)
- Multi-Technique Reprocessing and Combination using “Space-Ties”
- Status and performance of the GOCE satellite (Invited)
- GOCE Satellite and Mission Performance
- Rigorous GNSS network solutions of unlimited size
- Clock modeling for GNSS applications
- Cryosat: Mission Status, Achievements and Data Access
- Experimental Final IGS Product from ESA Based on GPS Measurements from a Network of LEO Satellites
- GNSS Analysis in a Multi-GNSS and Multi-Signal Environment
- GPS IIF yaw attitude control during eclipse season
- Impact of Jason-2 and Cryosat-2 on DORIS combination
- Solar Orbiter: Orbital characteristics and Opportunities for Multi-Point Observations
- Cryosat: Esa's Ice Explorer Mission. Two YEARs in Operations: Status and Achievements
- Impact of code and phase biases and clock modelling on ambiguity resolution
- Preliminary work on the DORIS contribution to the next International Terrestrial Reference Frame
- Validation results of the IAG Dancer project for distributed GPS analysis
- GNSS Analysis in a Multi-GNSS and Multi-Signal Environment
- GOCE: mission accomplished
- Insensitivity of GNSS to geocenter motion through the network shift approach (Invited)
- Position Corrections due to Uncalibrated GNSS Antenna Radomes at IGS Co-located Geodetic Observing Stations
- Status of DORIS contribution to ITRF2013
- CryoSat: ESA's ice explorer mission. 4 years in operations: status and achievements
- Ids and ITRF2013: Contribution and Evaluation
- The Ring System Discovered Around the Centaur Object (10199) Chariklo
- Swarm, 2 years of operations: update on constellation, instrument status and data quality.
- The 2018 Martian Global Dust Storm Over the South Pole Studied with VMC Onboard Mars Express
- Aeolus - Status of ESA's Doppler Wind Lidar Mission
- ESA Lagrange Space Weather Monitoring Mission to L5 Point
- Early results from the space weather instrument KSEM aboard the geostationary satellite GK2A at 128.2<SUP>o</SUP>E longitude
- First results from cruise tests of the Mercury Orbiter Radio science Experiment (MORE) of ESA's BepiColombo mission
- International Scientific Coordination on Space Weather: A COSPAR Panel on Space Weather Perspective
- International Scientific Coordination on Space Weather: A COSPAR Panel on Space Weather Perspective
- A long term study of twilight clouds on Mars based on Mars Express VMC images
- Atmospheric spirals in spring time on the edge of the North Pole of Mars
- COSPAR International Space Weather Action Teams: Addressing Challenges Across the Field of Space Weather.
- The IDS Contribution to the ITRF2020: Realization and Evaluation
- The LUCI instrument
- ESA Space Weather Strategy 2025
- Calibration and Performance of BepiColombo Radio Science Data During a Solar Conjunction Experiment
- The ESA Heliophysics Working Group: building cross discipline bridges to better serve the European Heliophysics community